ADU Builder in Maryland — Rules, Permits & Costs
Build an ADU in Maryland. 2026 rules for Montgomery, Prince George's, Howard & Frederick counties, the Maryland ADU Act, licensing, permits and real costs.
Last updated August 2026. County ordinances are actively changing under the Maryland ADU Act — we verify the current rules for your specific address as the first step of every project.
Accessory Dwelling Units in Maryland: The Complete 2026 Guide
Maryland just became one of the most ADU-friendly states on the East Coast. The Maryland ADU Act of 2025 requires every county and municipality to allow accessory dwelling units on single-family lots by October 1, 2026 — which means basement apartments, in-law suites, and backyard cottages are becoming buildable in places they never were.
Karma Construction Group designs, engineers, permits, and builds ADUs across Montgomery County, Prince George’s County, Howard County, and Frederick County under one contract — including the licensing steps that trip up most Maryland homeowners.
The Maryland ADU Act (HB 1466) — What It Requires
Signed April 2025 (passed the House 138–1 and the Senate 47–0), effective October 1, 2025:
- Every jurisdiction with zoning authority must adopt a local law authorizing ADUs on single-family detached lots by October 1, 2026
- An ADU may be attached or detached, up to 75% of the primary dwelling’s size
- ADUs are excluded from density calculations and residential growth limits
- ADU setbacks can’t exceed existing accessory-structure side/rear setbacks
- New parking mandates are restricted — allowed only after a parking study, with a waiver process
- HOAs and deed covenants may not unreasonably prevent you from building or renting an ADU (short-term-rental limits are still allowed)
Owner-occupancy rules remain a local decision — and most Maryland counties do require them, as detailed below.
ADU Rules by County (as of 2026)
| County | ADUs Allowed? | Max Size | Owner-Occupancy | Key Extra Step |
|---|---|---|---|---|
| Montgomery | Yes (since 2019) | 1,200 sq ft attached / least of 50% footprint, 10% lot, 1,200 sq ft detached | Yes | DHCA Class 3 ADU license ($615) |
| Prince George’s | Ordinance pending — due Oct 1, 2026 | Will follow state 75% cap | TBD | Fire sprinklers required in new builds |
| Howard | Yes — by right (Apr 2026) | 75% of principal footprint | Yes | DPZ permit + DILP building permit |
| Frederick | Yes | ≤1,000 sq ft by permit alone; larger by special exception | Yes | Impact fee waived ≤800 sq ft |
Montgomery County ADUs
Montgomery has been Maryland’s ADU leader since ZTA 19-01 took effect at the end of 2019, allowing attached and detached ADUs without a special-exception hearing on single-family detached lots (R-200, R-90, R-60 zones for detached units).
Size and use rules: attached ADUs up to 1,200 sq ft (a basement ADU may use the full basement); detached ADUs capped at the least of 50% of the main home’s footprint, 10% of the lot, or 1,200 sq ft. One ADU per lot, owner-occupancy required, occupancy capped at 2 adults plus children, and no short-term rentals. Parking: one on-site space — waived entirely within 1 mile of any Metrorail, Purple Line, or MARC station, which covers a large share of the county.
The step most people miss: every Montgomery ADU needs a DHCA Class 3 ADU rental-housing license — even if you never rent it. The application currently totals $615 ($490 in Takoma Park), includes a 30-day public-notice yard sign and DHCA inspections, and licensing typically runs 2–4 months alongside your DPS building permits. Construction can’t begin before DHCA’s preliminary inspection report — sequencing this correctly is exactly the kind of thing our permitting team manages so your project doesn’t stall.
Prince George’s County — ADUs Arriving by October 2026
Prince George’s currently does not permit ADUs — the county removed ADU provisions from its zoning rewrite, and existing units are unpermitted. But under the state Act the county must authorize ADUs by October 1, 2026; an ADU Task Force has finished its work and draft legislation is in the final adoption stages.
Two things PG homeowners should know now: the coming rules must conform to the state’s 75%-of-primary cap and setback limits, and Prince George’s requires automatic fire sprinklers in all new residential construction — including detached ADUs (roughly $1–$2/sq ft in new construction). If you design now, you file the day the ordinance takes effect — and you’re first in a very long line.
Howard County ADUs — By Right Since April 2026
Howard County’s CB 3-2026 (effective April 8, 2026) made ADUs by right in residential districts, aligned with the state Act: interior, attached, or detached; up to 75% of the principal dwelling’s footprint; maximum 2 bedrooms; owner-occupancy required; no short-term rentals. Lot-size minimums were removed, ADUs are exempt from school-adequacy (APFO) tests, and Columbia’s New Town district is included subject to its development-plan standards. You’ll need a Department of Planning and Zoning permit plus a building permit — and a rental license if you rent to non-family. Well/septic lots need Health Department sign-off, which we coordinate during design.
Frederick County ADUs
Frederick County (unincorporated areas) splits ADUs by size: units of 1,000 sq ft or less are a permitted accessory use needing only a building permit — no hearings. Larger units require a Board of Appeals special exception. All ADUs are capped at half the size and half the footprint of the main dwelling, owner-occupancy is required, one parking space is needed (street parking can count), and short-term rentals are prohibited. A meaningful cost break: ADUs up to 800 sq ft are exempt from the county’s school impact fee. The City of Frederick and other municipalities set their own rules — we confirm your exact jurisdiction first.
What an ADU Costs in Maryland
Planning ranges for suburban Maryland (from the Prince George’s Planning Department’s ADU study and Maryland builder-published 2026 figures):
| ADU Type | Typical Range | Notes |
|---|---|---|
| Basement conversion | $80,000 – $200,000 | Least site work; egress + kitchen drive cost |
| Garage conversion | $75,000 – $150,000 | Insulation, HVAC, plumbing upgrades typical |
| Attached addition ADU | $100,000 – $250,000 | Blends with the home like a standard addition |
| Detached backyard ADU | $120,000 – $300,000+ | ~$180–$400/sq ft in the DC-suburb market |
| Modular/prefab ADU | $150,000 – $200,000 | Faster, more cost-predictable |
Design, engineering, and permitting typically add $8,000–$25,000 depending on county and complexity; utility connections commonly run $5,000–$15,000 for detached units; and in Prince George’s, sprinkler systems add roughly $650–$1,300 for a typical new 650 sq ft unit.
How We Build Your ADU — One Contract, Four Phases
- Feasibility & design — zoning check for your exact address, utility assessment, and a design matched to your county’s size caps and your budget.
- Engineering, permits & licensing — structural drawings, building permits, and the county-specific extras: Montgomery’s DHCA license and public-notice process, Howard’s DPZ permit, Frederick’s impact-fee positioning. Permitting is a core competency.
- Construction — one project manager, our own crews, a published schedule.
- Inspections, license & occupancy — final inspections and every certificate needed to legally occupy (or rent) the unit.
ADUs pair naturally with a home addition or a whole-home remodel — and if you’re in Virginia, see our companion guide to ADU rules and costs in Northern Virginia.
Why Maryland Homeowners Are Building ADUs Now
- The law is on your side — the state Act even limits HOA interference
- Rental income in the DC suburbs’ deep rental market
- Multi-generational living — parents or adult kids, close but independent
- First-mover advantage — PG County opens October 2026; designed projects file first
Ready to find out what’s possible on your lot? Call 202.798.7663 or request a free ADU feasibility consultation below — we’ll give you a straight answer on zoning, licensing, timeline, and budget.
FAQ
Frequently Asked Questions
Are ADUs legal in Maryland?
Yes — and getting easier fast. The Maryland ADU Act of 2025 (HB 1466) requires every county and municipality with zoning authority to allow ADUs on single-family detached lots by October 1, 2026. Montgomery County has allowed ADUs since 2019, Howard County adopted by-right ADU rules effective April 2026, Frederick County allows them (small units by building permit alone), and Prince George's County is finalizing its ordinance to meet the state deadline.
What is the Maryland ADU Act (HB 1466)?
Signed in April 2025 and effective October 1, 2025, the Act requires all Maryland jurisdictions to authorize ADU development on single-family detached lots by October 1, 2026. It defines an ADU as a secondary unit up to 75% of the primary home's size, excludes ADUs from density calculations, limits ADU setbacks to existing accessory-structure setbacks, restricts added parking mandates unless a parking study and waiver process exist, and prevents HOAs and covenants from unreasonably blocking ADUs.
How much does it cost to build an ADU in Maryland?
As planning ranges: basement conversions typically run about $80,000–$200,000; garage conversions about $75,000–$150,000; attached-addition ADUs about $100,000–$250,000; and detached new-build ADUs about $120,000–$300,000+. Modular units typically complete for $150,000–$200,000. Add roughly $8,000–$25,000 for design and permitting. We provide written estimates after a site visit.
Do I need a license for an ADU in Montgomery County?
Yes — this surprises most homeowners. Montgomery County requires a Class 3 ADU rental-housing license from DHCA even if you never rent the unit. The application currently totals $615 ($490 in Takoma Park) including the filing fee, the required 30-day public-notice yard sign, and the first annual license fee. It runs alongside your DPS building permits, and construction can't start before DHCA's preliminary inspection report.
Can I build an ADU in Prince George's County?
Not quite yet — Prince George's County does not currently permit ADUs, but that is changing. Under the Maryland ADU Act the county must authorize them by October 1, 2026, and its ordinance is in the final stages of adoption. One certainty: Prince George's requires automatic fire sprinklers in all new residential construction, which will include detached ADUs. If you own property in PG County, designing now means you can file as soon as the ordinance takes effect.
Can I rent out my ADU in Maryland?
Long-term rental is generally the point of the law — and Maryland's Act even stops HOAs from unreasonably restricting it. But local rules apply: Montgomery, Howard, and Frederick counties all require owner-occupancy (you live in the main house or the ADU) and all three prohibit using the ADU as a short-term rental like Airbnb. Renting also typically requires a rental license (Montgomery's Class 3 ADU license, Howard's DILP rental license).